The beast waiting to get trackplates and cladding.

The beast waiting to get trackplates and cladding.
foto Marco Magielse

woensdag 8 juni 2011

first step of second phase : something is already running

31st May we were invited by Robert Vandaele in the workshops of Vandaele Machinery at Oostrozebeke, because he has finished the work he promised : the excavator tracks we bought last summer were able to be driven by the Gardner motor via the hydraulic pump. All this material is bought second hand and was put together into running condition by Robert in the workshops of Vandaele Machinery. Unnecesarry to say Robert is now eternally linked to this tankproject and we ow him a lot. Without him this second phase of making the framework mobile would not have been possible, while a lot of thanks must go also to Georges, who's making this financially possible.
Georges is standing besides me in the beginning of the film, I'm the youngest chap, while Robert in his grey-red coloured overall is operating the motor. At the end I'm operating the hydraulic pump levers, testing both directions. Unnecessary to say I was and still am marvelled ...

To have a first idea about what we are talking about, have a look at the youtube film :